Battery moulds sewer pipes

Rioolbuizen

A completely new plant was designed for the sustainable production of concrete sewer pipes with SCC for Kijlstra in Drachten. 

This project was realized together with our sister company KTB

The project consisted of 74 moulds and an automatic production line for moulds handling. 

In this carousel system moulds can be directed automatically. The process steps are fully automatic: demoulding, forming, filling and transport to the drying room. 

Technical Specifications

Description  Mould handling BlueTube plant for sewer pipes with SCC 
Customer  Kijlstra
Pipe dimensions  Ø300 – Ø1500 mm
Maximum pipe weight  5.000 kg
Concrete quality  SCC 
Control Fully automated opening and closing of the new moulds 
Pouring  Automatic filling of the moulds by means of pumping concrete 
Disciplines Concept design, engineering, production, assembly, maintenance 
Material  Steel, PU 
Engineering  Hydrauliek, elektrische aandrijvingen, PLC-besturing