Railroad substations – Westo 

CPS01

Technical Specifications

Project Mould for the production of prefabricated railroad substations 
Year  2006
Capacity/Size  Dimensions 3 x 3 x 2.5 m 
Disciplines  Design, production, assembly 
Material  Steel 
Engineering Hydraulic operation, concrete pumps 
Do you have questions, or are you interested in what we can contribute to your project? If so, please contact us.
Contact us
Railroad substations – Westo