Piling frame – Goliath

IMG_1247

For moving monopiles from a horizontal position to a vertical position Consmema has manufactured, preserved and installed 3 upending frames. 
 
The monopiles are guided from a horizontal position through the frame to which they are positioned vertically. 

Technical Specifications

Project Piling frame 
Aantal 3 stuks
Disciplines Manufacturing
Material Steel
Certification ASW D1.1
Supervision Loyd’s
Do you have questions, or are you interested in what we can contribute to your project?
Contact us
Djurre Lucardie | Sales Manager